From Work Order to Completion, In Real Time

See how GetDone tracks every maintenance task from creation through execution, giving you actionable analytics and visibility at every step.

1

Work Order Created

Work orders flow in automatically from your PMS, GetDone Dispatch, or manual entry. Every order includes issue type, priority level, unit details, and resident context. No duplicate data entry required.

WO #5120
MR
Water leak · kitchen ceilingUnassigned GetDone Dispatch
PropertyWillow Creek
Unit12B
AreaKitchen
CategoryPlumbing
Issue TypeWater leak
PriorityHigh
Date Reported07/27/2026 02:14 AM
Description

Active water intrusion through the kitchen ceiling. Resident and one child in the unit. Shut off at the riser before entry.

Phone call · Opened from a resident maintenance phone call.
Caller
Resident · Unit 12B · (512) 555-0148
Reported issue
Water coming through the kitchen ceiling
Call activity
2:14 AMCall answered
2:15 AMEmergency category matched
2:16 AMWork order #5120 created
?TechnicianUnassignedReassign
2

Assignment to Tech

Supervisors can easily assign work orders with a tap, and the system routes automatically to the technician. Reassign anytime based on priority, skill set, or workload.

Assign WO #5120
MR
Water leak · kitchen ceilingEmergencyPlumbingUnit 12B · Willow Creek
Assign Technician
Search technician…
MRMarcus Rivera3 open work orders
AMAlex Moreno5 open work orders
TNTessa Nguyen2 open work orders
RORuben Ortiz4 open work orders
Save Changes
3

Real-time Updates via Mobile

Techs update status from the field: in progress, on hold, waiting for parts. They attach photos, notes, and timestamps. Everything syncs in real time to the dashboard.

9:41
Update Status
In Progress
On Hold
Completed
Notify tenant
Save Changes
4

Work Order Closed

When the job is done, the tech closes the work order with required documentation. Completion notes and status are synced to your PMS automatically.

WO #5120
MR
Water leak · kitchen ceilingCompleted
Closed byMarcus Rivera
On site2:34 AM – 4:12 AM
Time on job1h 38m
Completion notes

Replaced the supply line under the sink and dried the cavity. Ceiling drywall needs a follow-up once it dries. Recurring WO created for Jul 31.

Photos
3 attached
Synced to your PMS
Status, notes and close date written back · 4:12 AM
5

Analytics Updated

The moment a work order closes, your dashboard updates. Completion rates, tech efficiency, and open backlog are all reflected instantly.

Analytics
MR
Completed this month
1,284
+8.4% vs Jun
Avg close
4.96d
target 5.4d
First-time fix
95.2%
4.8% callbacks
Avg turn time
9.1d
down from 11.3d
Completed by category
Plumbing341
HVAC288
Electrical196
Appliance152
Interior118
Avg days to close · 6 months
FebMarAprMayJunJul
Open backlog by age
0–14 days214
15–30 days78
31–60 days34
61–90 days12
90+ days4
Technician scorecard
TechnicianClosedAvgCallback
Alex Moreno1824.1d2.4%
Tessa Nguyen1684.6d3.3%
Ruben Ortiz1515.2d4.1%
Nadia Shah1346.0d5.7%

The Make-Ready Board

Track every unit turn from move-out to move-in ready. Each stage is a column on your digital board. Drag, assign, and track in real time.

Move-Out
Scope
Painting
Carpet
Punch
Cleaning
Quality Inspection
Move-In Ready

Real-Time Status

See which units are in scope, which are being painted, and which are waiting on quality inspection, all at a glance.

Service Coordination

Assign painting, cleaning, carpet, and punch to internal techs or your external vendors from the board.

Turn Time Tracking

Every stage is timestamped. Know exactly where time is being lost and optimize your turn process.

High-Risk Workflow

Some work orders carry more risk, like water damage, mold, liability-sensitive repairs. GetDone enforces a guided workflow to protect your properties and your team.

Guided Steps

High-risk work orders follow a prescribed sequence. Techs can't skip steps or close prematurely. Each step includes instructions specific to the issue type.

Required Photos

Before-and-after photos are mandatory for high-risk orders. The system won't allow closure without documentation, creating an automatic paper trail for claims.

Approval Gates

Supervisors must approve high-risk completions before the work order closes. Review photos, notes, and compliance steps from the dashboard before sign-off.

Ready to See This in Action?

Get a personalized walkthrough of the full GetDone workflow.

Schedule a Demo
Request a Demo